• Composting plant design on the island Ios* 
  • Solid Waste Management Study for the Messinia Integrated Tourism Development Area of Romanos (Costa Navarino resort)* 
  • Construction Design Study for the Landfill of island Naxos* 
  • Construction Design Study for the Landfill of the 2nd section of Epirus Region* 
  • EIA for a Cogeneration Station which produces both Electricity (22 MW) and useful Heat (75,3 MW) from secondary fuels at the Industrial Park of Thessaloniki* 
  • EIA for the Waste Water Treatment Plant of Zacharo in a Natura site 
  • EIA for the Waste Water Treatment Plant of Gastouni and Vartholomio in a Natura site 
  • EIA for the Waste Water Treatment Plant and Sewage Network of Kyparissia* 
  • Rehabilitation Study for Mine Huntite at Kozani*

 

NOTE: The studies-services marked with an asterisk (*) have been elaborated through participation in study group on command.